Proposed Improvements
 |
|
|
Intersection of US 1 & US 322 |
|
The process used to define the extent of highway
improvements necessary to address the needs along US 322, Section 100
has guided the design team to propose that the project be
reconstructed substantially within the existing right-of-way. A
minimum of two through lanes are proposed in each direction over the entire project length to improve capacity. The reconstruction project will
separate the two directions of traffic with a concrete median
barrier to control access across the highway. A fifth
center turn lane will be constructed between Chelsea Parkway and Cherry Tree Road to accommodate left turns into and out of the
adjacent commercial properties while auxiliary right turn lanes
will be provided at selected intersections to maintain the free
flow of traffic through the corridor.
(Click
here to see Typical Sections indicating the general method of
widening US 322 through the corridor.)
The following
intersection improvements are proposed for the project:
Although the
widening of US 322 from two lanes to four lanes will
primarily entail widening to the south of the existing road to
make use of the available right-of way, widening to the north or
about the center will be done at some locations to minimize
impacts to environmental and community resources. |