  Project Overview
  Project Location
  Project Needs
Proposed Improvements
 

Proposed Improvements

 
Intersection of US 1 & US 322  

The process used to define the extent of highway improvements necessary to address the needs along US 322, Section 100 has guided the design team to propose that the project be reconstructed substantially within the existing right-of-way. A minimum of two through lanes are proposed in each direction over the entire project length to improve capacity.  The reconstruction project will separate the two directions of traffic with a concrete median barrier to control access across the highway.  A fifth center turn lane will be constructed between Chelsea Parkway and Cherry Tree Road to accommodate left turns into and out of the adjacent commercial properties while auxiliary right turn lanes will be provided at selected intersections to maintain the free flow of traffic through the corridor.  (Click here to see Typical Sections indicating the general method of widening US 322 through the corridor.)

The following intersection improvements are proposed for the project:

Although the widening of US 322 from two lanes to four lanes will primarily entail widening to the south of the existing road to make use of the available right-of way, widening to the north or about the center will be done at some locations to minimize impacts to environmental and community resources.